FarmingCourses → Data Farming
Subscribe Customers

Mission: Cultivating the future of computing through sustainable data farming

Data Farming: Harvesting Computational Power from Earth to Orbit

Building the future of distributed computing through agricultural innovation and space technology.

2026Space launch with GALAMAD ProSat
56Drone-powered clusters across Nigeria
3-5 yrsOrbital mission lifespan
Agricultural drones over Nigerian farmland
LEO data center in orbit
Data streams connecting Earth ↔ Orbit

Exoskeleton Data Farm Unit

  • Power: 1.2 kW
  • Compute: 320 TFLOPS mixed precision
  • Thermals: Passive radiative cooling
  • Downlink: 480 Mbps Ka-band
  • Orbit: 550 km LEO | 98°
  • Mission: 3-5 years
Orbit illustration

Roadmap 2024-2032

Journey Map

Three phases that take Data Farming from prototype to a hybrid Earth-orbit computing fabric.

Phase I

Space Pioneer

2024-2026

  • Q4 2024: Concept validation & prototype
  • Q1 2025: Exoskeleton unit design locked
  • Q2 2025: GALAMAD partnership (Christopher Luwanga)
  • Q3 2025: Manufacturing & space qualification
  • Q4 2025: Shared-ride payload integration
  • 2026: Launch aboard ProSat
3D rotation

Interact with the exoskeleton data farm concept and surface-level specs.

Phase II

Terrestrial Network

2026-2028

  • Q1 2026: Fish farm data center (Asaba)
  • Q2-Q4 2026: 50 AI-driven drones manufactured
  • Q1 2027: Deployment to 56 clusters nationwide
  • 2027-2028: Edge network fully operational
Asaba Hub
56 Clusters online

Interactive Nigeria map with live data flows.

Phase III

Earth-Space Integration

2029-2032

  • 2029: Full collaboration with GALAMAD & Airbus
  • 2030: Advanced terrestrial agro-data center
  • 2031: Space-ground platform launch
  • 2032: Hybrid terrestrial-orbital infrastructure

Animated flow between ground stations, terrestrial centers, and LEO constellation.

Orbital Unit Specs

  • Power: 1.2 kW
  • Compute: 320 TFLOPS (AI)
  • Cooling: Passive radiative
  • Downlink: 480 Mbps Ka-band
  • Orbit: 550 km sun-synchronous
  • Duration: 3-5 years

Drone Specs

  • GPU: NVIDIA Jetson Orin NX / AMD Kria
  • Compute: 60 TOPS per drone
  • Flight time: 78 minutes
  • Coverage: 250 hectares per sortie
  • Sensors: Multispectral, LiDAR, thermal
  • Dual use: Agro AI + edge compute

Terrestrial Nodes

  • Location: 56 clusters
  • Hub: Asaba fish farm DC
  • Network: mmWave backhaul + fiber
  • Power: Solar + grid hybrid
  • Latency: <18 ms intra-cluster
  • Uptime: 99.7% SLA

Primary CTA

Invest in the Future of Computing

Ground-floor opportunity across terrestrial validation and orbital expansion.

Stay Ahead

Subscribe for updates

Monthly milestones, investor notes, and technical releases. No spam — only signal.